COMPRESSION FACILITIES

 

·         HUSKY Debolt (Seal Lake) Compressor 3-26-82-14W5M

The project consisted of engineering, design, procurement, PLC programming, and commissioning to install one electric screw 800 HP compressor and remove the existing 1745 HP compressor.

 

·         PARAMOUNT MAXHAMISH 2600HP COMPRESSOR

Designed and installed compression and dehydrator to process Paramount’s gas in the Fort Liard area. Total throughput was 60 MMSCFD.

 

·         SAMSON BUICK CREEK COMPRESSOR REVAMP

Replaced sour gas turbine driver (2000 hp) with and electric motor to drive an existing gathering system compressor.  The installation included a 700 hp screw (booster) to draw down the gathering system pressure and increase production. Both electric motors were designed to start with a common VFD (start-up only) to reduce costs and minimize disruption to a weak BC Hydro power distribution grid.


Samson Buick Creek Compressor Station

·         SERENPET MCLEOD 9-30 NEW COMPRESSOR INSTALLATION

Full EPCM project to install refurbished 1200 HP Compressor IR-2HOSWA-7042GSI EFX Driver. Compressor was to de-bottleneck gas gathering system.  Facility designed for 35 MMSCFD (150 psia suction to 1200 psia discharge)

 

·         PETROMET FOXCREEK GAS PLANT REVAMP AND 40 KM PIPELINE/GATHERING SYSTEM

Installed inlet separator/pump and compressor to process additional gas. Total cost for pipeline and facilities was approximately $6.5 million.

 

·         PETROMET PEACE RIVER COMPRESSOR INSTALLATION

Relocated 1000 HP – 4 throw – 2 stage compressor unit to handle 6-8 MMSCFD of sweet gas from Highvale to Peace River, Project comprised of: PLC, dehy unit, metering skids and office/MCC building. Total cost of project was $1.7 million.

 

·         PETROMET HIGHVALEE COMPRESSOR STATION

New CAT. 3406 JA/Ariel JGA-2 215 BHP compressor installation.  Project included replacing unit, foundation modifications, pipe rack extension and instruments/controls modifications. Total cost was $1 million.

 


·         CABRE EXPLORATION LTD. SHALLOW GAS COMPRESSION

Installed four Screw Booster Compressors at different locations. The booster were modularized to ease installation. They all included total spill containment and fire & gas detection shutdown & blowout.


Cabre Exploration Ltd. Shallow Gas Compression

·         CABRE EXPLORATION LTD. SHALLOW WELL GAS GATHERING SYSTEM & SALES FACILITY

Installed a 12 MMSCFD reciprocating Compression/Dehydration system and low-pressure Gathering system C/W remote metering and a 600 HPS screw booster compressor.  The central facility included a helipad, workshop, and residence. All facilities include state of the art environmental and safety containment, control and shutdown.

 

·         CABRE EXPLORATION LTD. – COMPRESSION TWO WELL TIE-IN

Installed a 5 MMSCFD reciprocating Compression/Dehydration system to allow the wells to feed directly into the NOVA system. The facility was modularized to facilitate it’s relocation after the wells are depleted.  As with other Falcon EDF Ltd. designed facilities, there is total spill containment and fully automated fire & gas detection and Shut down/blow down.

 