GAS WELL TIE-INS

 

  •          GULF BRAZEAU 14-7 WELL TIE-IN

Fast tracked well tie-in, flow= 15MMSCFD (1. 5% H2S) Line heater, Separator, and 2 km pipeline. Project was completed in 2 months on budget. Falcon purchased all equipment and materials and paid invoices. Total job cost = $1 million.

 

  •          GULF GROAT 5-15 SOUR GAS WELL TIE-IN

Complete tie-in of a 5. 2 MMSCFD Sour Gas Well.  Project included an 8600 m, NPS-4? insulated pipeline, line heater flare and methanol injection. The project cost was $1. 2 million

 

  •          CANADIAN 88 9-20 CHEDDARVILLE SOUR GAS WELL TIE-IN

Full Design and Procurement of a 6. 5% Sour Gas Well tied into the Gulf Strachan gathering system.  Well with hot oil string, SSESDV, Separator/Dehy and incinerator. Well flow = 10 MMSCFD.

 

  •          ANADARKO PETROLEUM SOUR GAS WELL TIE-IN FT. ST. JOHN BRITISH COLUMBIA

Tied in 17% H2S Sour Gas Well at Stoddart, B. C. to Kerr McGee Sour Gas Plant. Down hole/Wellhead ESDV?s Line heater, Flare and insulated pipeline. The project was completed in 4 months.  Total cost was $340,000. (1995)

 

  •          NOVA BALATER METERING STATION

Performed tie-in of Petromet/Peace River gas to NOVA Metering station. Project included SCADA, piping, sampling and metering.  Full EPCM project cost was $180K.