INTERNATIONAL PRESENCE

 

·         AECE LAGO AGRIO 4 X 1000 HP CENTRILIFT WATER INJECTION PUMPS

The project comprised the following:

 

·         Debottleneck the water distribution of the injection underground pipelines. Addition of 6100 m of NPS-12” linepipe was installed.

·         Debottleneck the MPF and Dorine Battery surface water injection piping. Addition of 200 m of NPS-16” B31.3 injection pump suction header.

·         Installation of 4 new water injection pump trains including 2 booster pumps and 4 centrilift high pressure injection pumps. This added 80,000 BBL/D of  high pressure water injection capacity.

 

The cost of this project was 9.1 million dollars US.

 

·         AECE LAGO AGRIO TANK FARM & CRUDE PUMPING TRANSFER FACILITY (2002)

Project Management of 2x100,000 BOPD Sales Tanks and Pumping Facilities. Included environmental and regulatory co-ordination. The cost of this project was 7 MM US Dollars.


AECE Doring-1 Injection Pumps

·         CANADIAN OCCIDENTAL LIMITED HEAVY CRUDE FRACTIONATION AND PIPELINE

Developed Process Design and Cost budget for Fractionation versus Emulsion for Transportation via pipeline of 10 API Crude through Andes Mountain in Ecuador (500 Mile Length). Performed Pipeline Process runs with PIPEFLO Computer software.  Precursor of OCP (Oleoducto Crudos Pesados) pipeline installed subsequently to transport crude from Lago Agrio (Oriente) to Esmeraldas Port.

 

 

 

·         CANADIAN OCCIDENTAL (INTERNATIONAL) OIL FACILITIES REVIEW AND UPGRADE

Evaluated existing facilities at Cabimas, Venezuela for 40,000 to 80,000 BBL/D of oil production and treating. Full development plan and cost prepared for all facilities.

 

·         CAN OXY PETROLEUM

o    Venezuela 1994; Field trip, facilities evaluation and development plan for Colon/La Ceiba Field development (20k bbl/d).

o    Venezuela 1995-1996; full evaluation and development plan for Cabimas field (Scenario for 20 k to 100k bbl/d oil production).

o    Venezuela 1997; facilities review for bid round evaluation.

o    Ecuador 1997; ITTI-Tiputin to La Esmeralda fractionation facility and emulsion pipeline.

o    Performed basic process design, cost estimate and development plan for a 720 km pipeline and a 120k bbl/d production facility.

o    Colombia 1998; Facilities review for bid round evaluation.

o    Mexico 2005; Burgos study to bid PEMEX capital investment opportunity.

 

·         COMODIN

Bolivia 1996; Process design and basic engineering for a NPS – 10”, 8”, and 6”, 260 km. pipeline system through the Andes mountains (Elevation max 3,700m).  This system is in operation.

 

·         MALONEY/RIO SAN JUAN

Mexico 1997; Basic engineering for the Jujo battery upgrade in Villa Hermosa, Tabasco state resulting in production increase of 20k bbl/d.  Also added solution gas dew point control.

 

·         HALLIBURTON ENERGY SERVICES

ORENBURG Russia; 1997-1998; initially under contract to Maloney Industries, Falcon EDF Ltd. was commissioned to design the interconnecting piping design and skid installation for a 10, 000 bbl/d sour oil battery process skids included: compression, separation gas J/T plant, product storage.  Following Maloney’s departure from the project, Halliburton Energy Services expanded Falcon’s scope of work to include the overall design, supply and construction assistance, as-built drawings and start up co-ordination. As a result, Falcon EDF Ltd. commissioned a number of its staff to the site during the construction phase and played a key role during commissioning and start-up of the battery during the summer of 1999.

 


Orenburg - Early Product System Low and High Pressure Separator

·         PEMEX JUJO BATTERY PRODUCED WATER HANDLING SKIDS

Designed fully skidded produced water processing facilities to remove solids and oil from produced water for re-injection. Total water handled was 25,000 BBL/D. Skids were fully contained.

 

·         SANTOS LTD. (AUSTRALIA-2002)

Preliminary design of injection facilities and budgetary cost estimates.

 

·         VARIOUS PROJECTS IN LATIN AMERICA

Facilities evaluations of upstream projects in Venezuela, Colombia and Mexico.  Process design and basic engineering for NPS-10”, 8”, and 6”, 160 mile pipeline system in Cochabamba, Bolivia (for Protexa Mexico).

 